Sep 27, 20201 min readBrisa29 Framing Update (9/25/2020)We started installing plywood on the second floor of buildings 100-300, and we are continuing to frame the first floors of building 400.
We started installing plywood on the second floor of buildings 100-300, and we are continuing to frame the first floors of building 400.